Ecole Allain St-Cyr
|
|
Located in Yellowknife,
NWT
|
|
|
|
|
Exterior view
|
La Garderie Plein Soleil day care
|
| |
|
| Client:
|
Department of Education,
Culture and Employment |
| Design Contractor:
|
Guy Architects, Yellowknife |
| Contractors: |
Clark Builders (general), Yellowknife |
| |
A.D. Williams Engineering (structural,
electrical engineering), Yellowknife |
| |
Thorn Engineering (mechanical),
Yellowknife |
| PWS Project
Officer: |
Kayhan Nadji, MRAIC, OAQ, NWTAA |
| Construction
Cost: |
$3.9 million |
| Funded by:
|
Government of Canada, Department
of Canadian Heritage |
| |
Government of the NWT, Department
of Education Culture & Employment |
| Official
Opening: |
February 27, 2000 |
| |
|
| Ecole Allain St-Cyr is a 1500
sq. metre , multi-purpose facility. The school has 6 classrooms
for a maximum of 132 Francophone students from kindergarten
to grade 12. A daycare with a separate entrance has room
for up to 30 children. The facility is also used by the
French community of Yellowknife as a cultural centre. |
| |
| The rotunda is the multi-purpose
focal point of the building. It can serve as a community
hall or as a theatre with seating for 250. During school
hours, it can be configured to serve as 2 classrooms. |
| |
| The building uses a displacement
ventilation system. Fresh air enters every room at the floor
level and the stale air is exhausted at the ceiling level.
The building also features an in-floor heating system. |
| |
| Previous
Project |
Back to PWS Home |