|
Ecole Allain St-Cyr
|
|
|
Located in Yellowknife,
NWT
|
|
![]() |
![]() |
|
Exterior view
|
La Garderie Plein Soleil day care
|
| Client: | Department of Education, Culture and Employment |
| Design Contractor: | Guy Architects, Yellowknife |
| Contractors: | Clark Builders (general), Yellowknife |
| A.D. Williams Engineering (structural, electrical engineering), Yellowknife | |
| Thorn Engineering (mechanical), Yellowknife | |
| PWS Project Officer: | Kayhan Nadji, MRAIC, OAQ, NWTAA |
| Construction Cost: | $3.9 million |
| Funded by: | Government of Canada, Department of Canadian Heritage |
| Government of the NWT, Department of Education Culture & Employment | |
| Official Opening: | February 27, 2000 |
| Ecole Allain St-Cyr is a 1500 sq. metre , multi-purpose facility. The school has 6 classrooms for a maximum of 132 Francophone students from kindergarten to grade 12. A daycare with a separate entrance has room for up to 30 children. The facility is also used by the French community of Yellowknife as a cultural centre. | ||
| The rotunda is the multi-purpose focal point of the building. It can serve as a community hall or as a theatre with seating for 250. During school hours, it can be configured to serve as 2 classrooms. | ||
| The building uses a displacement ventilation system. Fresh air enters every room at the floor level and the stale air is exhausted at the ceiling level. The building also features an in-floor heating system. | ||
| Previous Project | Back to PWS Home | Main Project Page |
/Exterior%20View.gif)
/Day%20Care.gif)